Tiny cabin update: then and now

On July 9, 2015, I wrote in my 5-year journal, “Worked on the land–2 tarps down and dirt where the house will be.”

Tiny Cabin Spot - June 2015

Tiny Cabin Spot – June 2015

Even though we began this adventure in May of 2015, it took us awhile to find the perfect spot and then clear it. We had hoped to complete the cabin by the time school started last year, but we didn’t finish the foundation until October or have a frame until March.

So now, one year after the first dirt was spread on the cabin site, we can see how far we’ve come. We’re not exactly putting on the “finishing touches,” but things are moving much faster now.

In the past two weeks, we’ve spent a lot of time at our current home, which has a sizable yard to maintain and wood floors crawling with dust bunnies. I had hoped to do more deep cleaning and closet organizing, but I’ve been busy freelance editing. Still, we made time for respites of play: West Side Story and Romeo and Juliet were unforgettable. We saw a 1623 First Folio as well–each state in the U.S. currently has one on display in honor of the 400th anniversary of Shakespeare’s death.

This past Friday, the conditions were right for cabin work. We drove through rain hoping that it wouldn’t follow us. The morning was cloudy and comfortable, especially for July. I trimmed Bradford pears while Chuck hung the front door and framed the window.

 

Exterior doors aren’t cheap, but we got lucky. A few months ago, my brother stopped some restaurant workers from throwing two doors in a dumpster. They’re solid wood and in good shape.

Once the trim was up, we could finish the rows of shingles. We’ve ordered tempered glass for the transom windows, so our next steps are to finish the shingles, install the windows, and finish hanging the door (which will need to be filed at the bottom and possibly repainted).

From outside, our cabin is beginning to look like a house–and soon we’ll be working to make the inside a home.

Tiny Cabin Update: Walls

This week we spent three days at the land with a long list of minor and major tasks. The weather was on our side, considering it was late June. Though it reached 90 degrees a couple days, the heat index stayed under 100. One day was partly cloudy, and another had a breeze. We arrived early with the intention of quitting at lunch, but we were able to work longer without exhausting ourselves.

 

We made a big purchase this week that sped up progress: a generator. Our neighbors have been generous in letting us link extension cords to use their electricity, but we decided this would be a good investment to make sooner rather than later.

This week’s “to do” list:

  • Assemble generator
  • Frame and install bathroom window
  • Spread gravel for more even ground for scaffolding
  • Finish sub-floor (measure, cut, and nail boards)
  • Finish base walls (measure, cut, and nail boards)
  • Add foam insulation (cut, nail, and seal with tape)
  • Reinforce side wall with the “great window”
  • Buy framing supplies, trim, and paint

Aside from a few small patches high on the side walls, we accomplished all of our goals. Chuck’s dad came on Tuesday and Thursday. His know-how amazes me. Where I might hesitate on deciding the best plan of action, he acts. And once he shows me how to do something, I am more confident in my actions, not to mention more efficient.

We also plan to do pink insulation between the studs, but the foam board will create a tighter seal and add additional insulation.

I enjoyed being on the scaffolding–again, I’ve had lots of monkey-bar experience. I’m also more comfortable wielding the nail gun. Over time, my arm muscles have strengthened and my fear of the nail gun has waned. I’m happy to leave the sawing to Chuck. He’s also much better at making a pattern with the foam board nails, which will be helpful later when we’re nailing up the cedar shingles on the front and the siding on the other walls. (The panel I nailed looks like it was done by a sawed-off shotgun, and I used twice as many nails as was necessary.)

Next week the temperature will soar to 100–perfect for swimming in Lake Beaverfork or reading a good book in air conditioning. We also have tickets to see the Arkansas Shakespeare Theatre‘s Romeo and Juliet and West Side Story. We’ve already enjoyed the outdoor A Midsummer Night’s Dream but missed Twelfth Night, which was sold out this morning! We’re anxious to finish the cabin, but we’re also trying to find balance.

We’ll work at the land tomorrow before family comes in for the 4th. Hopefully, by the end of next week, we’ll have the trim up and at least some of the cedar shingles.