Tiny Cabin Update: Walls

This week we spent three days at the land with a long list of minor and major tasks. The weather was on our side, considering it was late June. Though it reached 90 degrees a couple days, the heat index stayed under 100. One day was partly cloudy, and another had a breeze. We arrived early with the intention of quitting at lunch, but we were able to work longer without exhausting ourselves.

 

We made a big purchase this week that sped up progress: a generator. Our neighbors have been generous in letting us link extension cords to use their electricity, but we decided this would be a good investment to make sooner rather than later.

This week’s “to do” list:

  • Assemble generator
  • Frame and install bathroom window
  • Spread gravel for more even ground for scaffolding
  • Finish sub-floor (measure, cut, and nail boards)
  • Finish base walls (measure, cut, and nail boards)
  • Add foam insulation (cut, nail, and seal with tape)
  • Reinforce side wall with the “great window”
  • Buy framing supplies, trim, and paint

Aside from a few small patches high on the side walls, we accomplished all of our goals. Chuck’s dad came on Tuesday and Thursday. His know-how amazes me. Where I might hesitate on deciding the best plan of action, he acts. And once he shows me how to do something, I am more confident in my actions, not to mention more efficient.

We also plan to do pink insulation between the studs, but the foam board will create a tighter seal and add additional insulation.

I enjoyed being on the scaffolding–again, I’ve had lots of monkey-bar experience. I’m also more comfortable wielding the nail gun. Over time, my arm muscles have strengthened and my fear of the nail gun has waned. I’m happy to leave the sawing to Chuck. He’s also much better at making a pattern with the foam board nails, which will be helpful later when we’re nailing up the cedar shingles on the front and the siding on the other walls. (The panel I nailed looks like it was done by a sawed-off shotgun, and I used twice as many nails as was necessary.)

Next week the temperature will soar to 100–perfect for swimming in Lake Beaverfork or reading a good book in air conditioning. We also have tickets to see the Arkansas Shakespeare Theatre‘s Romeo and Juliet and West Side Story. We’ve already enjoyed the outdoor A Midsummer Night’s Dream but missed Twelfth Night, which was sold out this morning! We’re anxious to finish the cabin, but we’re also trying to find balance.

We’ll work at the land tomorrow before family comes in for the 4th. Hopefully, by the end of next week, we’ll have the trim up and at least some of the cedar shingles.

 

Tiny Cabin Update: Roof!

Chuck’s Uncle Bobby and his cousin Scott arrived at 8 am after a three-hour drive from northwest Arkansas ready to roof the tiny cabin.

The first order of business (after the hugs and handshakes) was to finish nailing the decking. Bobby and Scott then suggested screwing 2″ x 4″s along each seam to prevent sagging. Chuck cut the boards, Bobby held them to the inside of the roof, and Scott used his battery-powered drill to screw them in. The rest of us–my stepson Geoffrey, his girlfriend Angel, and I–tried to make ourselves useful.

The shade dwindled like a receding tide. We felt beached beneath the hot sun. Though the day originally promised to be “partly cloudy,” we were only lucky enough to have five glorious minutes of cloud cover around 1 pm. I was hot, so I could only imagine how Scott and Bobby felt.

I would like to say that our heroic roofers enjoyed frequent breaks in the shade, but they toughed it out. Bobby–two days shy of 61–was up and down the extension ladder helping with the drip edge, the tar paper, and the first row of shingles. Scott worked higher up and along the steep edges. We handed Bobby shingles, and he took them to Scott. Someone was always holding a ladder.

Though I mostly admired their handiwork from the ground, it was enthralling to watch them roof. Of course, I was nervous with Scott up so high. I could tell he knew what he was doing, but he wasn’t overconfident. Though he and Bobby cracked jokes to lighten the mood, they were both serious when it came to safety. In this situation, safety meant awareness–an art almost lost in our modern world of buzzing phones and constant distraction.

By a quarter to noon, they had finished the back. The air was really heating up, and the humidity didn’t help. But with the drip edge done and their system perfected, the front side only took less than an hour and a half to complete.

By now, fair-skinned Angel was resting in the shade. Geoffrey cut the 54 shingles for the peak, and Scott had them nailed in no time.

Tiny Cabin Roof Finished

With Chuck’s arm still recovering coupled with our lack of expertise, we were glad to have called in professionals. But even more than that, we were glad to be with family.