Tiny Cabin: Ceiling

A month ago we picked Saturday, May 20th for Chuck’s cousin Scott to come down from Northern Arkansas and help us insulate and finish the tiny cabin ceiling.
In spite of a 100% chance of rain and two snakes (in passionate embrace or bloody murder) inside the cabin earlier in the week, we were not canceling.
One road into Higginson was flooded; the other was puddled but passable. Some roofs were still covered in tarps from the tornado that blew through a couple months ago. (Sometimes I wonder what plague-ridden place we’ve chosen for a simpler life.)
Scott, who roofed the cabin for us last June, has the muscle memory to do in one hour what would take us all day. He put the insulation on his back, and as he went up the ladder, slid the insulation in place until his head was supporting the last segment.

 

While the insulation is squeezed between the studs, gravity is still at work. Chuck, on a smaller ladder, stapled the bottom half of the insulation while Scott stapled the top half. My father-in-law (Charles Bane, Sr.) sliced the insulation to fit–each piece was about 9″ too long. I mainly swatted mosquitoes–“big enough to pick up a child,” as Scott said–and watched.
By early afternoon the ceiling was complete–mission accomplished!
We’ll still need to run a strip of wood up the middle to hide the seam between the two sides of the ceiling. The wood’s light color makes the cabin feel spacious and airy. As much of a pain as the steep roof has been, it’s the reason the tiny cabin doesn’t make me feel claustrophobic.
This week Chuck finished the shed and we started moving things out of the cabin. We still have cleanup and organizing to do, but we’re over a hump. With the shed in place, we can set up the compost bin for the toilet. We still need to dig a trench, run the pipes, and install the toilet–our next big hurdle.

Tiny Cabin: Summer Vacation

Between frequent rain and the busy end of the semester, we basically managed to maintain the property and insulate the walls of the tiny cabin.
We’ve ordered parts for the bathroom, including a mop sink for a shower. We couldn’t find a shower basin smaller than 32″ x 32″, and we needed something along the lines of 27″ x 27″. After a couple YouTube DIY videos, Chuck was ready to pour the concrete himself and tile it. I love his determined spirit–it is what has taken us this far–but we are ready to streamline our process. So when I ran across the mop sink for $125 and free shipping, we jumped at the chance.
The components for the bathroom are ready–they just need to be assembled. The first and greatest task is the composting toilet. The compost bin must be away from the house and sheltered from the elements, and we need to dig a trench for the piping system. I can’t remember what we were expecting when we bought the toilet two years ago, but it seems more involved now than when we purchased it.
Once assembled, we’ll need a solar panel to make the pump work. But one thing we won’t have to worry about is water–it takes only 1/4 a cup to flush.
So, last week Chuck worked first on clearing the land and then on assembling the shed which will house the compost bin. The shed will also give us a place to store other items taking up precious space in the cabin.

On different days he had help from his dad, me, and his son Geoffrey. The summer heat hasn’t arrived yet, but we did hit 86 degrees–a drastic change from the 50s and 60s of the week before.

This weekend Chuck’s cousin Scott–who roofed the cabin for us–is coming to help finish the ceiling insulation and panels. After Chuck’s fall last year, there are certain jobs on which I insist having professional help.

Tiny Cabin Exterior May 2017

We’re still dodging rain (and, now, mosquitoes), but we should have a few weeks of somewhat pleasant weather. And unlike last year at this time, the tiny cabin has a roof, so even on rainy days we can do things inside.