Tiny Cabin Update: Roof!

Chuck’s Uncle Bobby and his cousin Scott arrived at 8 am after a three-hour drive from northwest Arkansas ready to roof the tiny cabin.

The first order of business (after the hugs and handshakes) was to finish nailing the decking. Bobby and Scott then suggested screwing 2″ x 4″s along each seam to prevent sagging. Chuck cut the boards, Bobby held them to the inside of the roof, and Scott used his battery-powered drill to screw them in. The rest of us–my stepson Geoffrey, his girlfriend Angel, and I–tried to make ourselves useful.

The shade dwindled like a receding tide. We felt beached beneath the hot sun. Though the day originally promised to be “partly cloudy,” we were only lucky enough to have five glorious minutes of cloud cover around 1 pm. I was hot, so I could only imagine how Scott and Bobby felt.

I would like to say that our heroic roofers enjoyed frequent breaks in the shade, but they toughed it out. Bobby–two days shy of 61–was up and down the extension ladder helping with the drip edge, the tar paper, and the first row of shingles. Scott worked higher up and along the steep edges. We handed Bobby shingles, and he took them to Scott. Someone was always holding a ladder.

Though I mostly admired their handiwork from the ground, it was enthralling to watch them roof. Of course, I was nervous with Scott up so high. I could tell he knew what he was doing, but he wasn’t overconfident. Though he and Bobby cracked jokes to lighten the mood, they were both serious when it came to safety. In this situation, safety meant awareness–an art almost lost in our modern world of buzzing phones and constant distraction.

By a quarter to noon, they had finished the back. The air was really heating up, and the humidity didn’t help. But with the drip edge done and their system perfected, the front side only took less than an hour and a half to complete.

By now, fair-skinned Angel was resting in the shade. Geoffrey cut the 54 shingles for the peak, and Scott had them nailed in no time.

Tiny Cabin Roof Finished

With Chuck’s arm still recovering coupled with our lack of expertise, we were glad to have called in professionals. But even more than that, we were glad to be with family.

Tiny Cabin: Back in the Saddle

The first week after the accident is a blur of bandages, medicine, and doctors’ appointments. That, and kind friends and family bringing by food and checking in.

All of the various doctors–the ENT, general physician, optometrist, and chiropractor–reiterated that the fall could have been much worse. We are counting our blessings.

On other fronts, we found out that my mother-in-law’s pancreatic cancer has developed to Stage 4, and one of my step-daughters moved to South Carolina with her baby, Alex.

It would be easy to say that life moves forward and we move with it. But that glosses over the emotional processing that great (and abrupt) changes demand.

Chuck’s body is still healing–the hematoma in his right arm restricts how much he can lift, and the nerves in his face are slowly regaining feeling. The emotional wounds, however, remain fresh.

I spent several sleepless nights and red-eyed days thinking of our next move. My main concern: the 12/12 pitch roof. We went away for a couple of days to celebrate our 11th anniversary and to clear our heads.

We reached out to Chuck’s cousin, Scott, who has worked in construction and even built his own house. He was up to the challenge. Once we knew we had the roof covered, we felt we could make plans. And I could get some sleep.

It was now time to finish the decking, which would require a third person, not to mention poise on scaffolding. A colleague, Russ, volunteered to help, and we managed to tack up the rest of the decking in less than two hours. It was an enormous hurdle after we had seriously questioned whether or not we would be able to finish the cabin at all.

After the decking, our next move was to get as many walls up as possible.

We were under a heat advisory, with temperatures in the 90s and a heat index over 110 degrees. Chuck and I started at 6:30 and had to quit before noon. Chuck’s shirt was soaked to the hem, and my face was puffy and red.

At first, I held the sheet of OSB while Chuck fired the nail gun. But I wasn’t strong enough to hold the full sheets straight, and Chuck’s arm was tiring out from the heavy nail gun. So we switched.

Chuck said he was glad I had gotten over my fear of the nail gun. “I wouldn’t go that far,” I replied. I’m still terrified of it, and rightfully so. But I’m less afraid when I’m the one in control of the beast. When I was holding the board, I had to wait in anticipation for the loud bang, puff of air, and cloud of displaced wood particles.

It takes both of my hands to keep the nail gun steady, but now I know what to expect–and I know when it’s going to strike.

We didn’t get as far as we had hoped, but we got our strength and momentum back.

A blog on the roof will follow soon…

 

 

Tiny Cabin: Summer Growth

Just hours after Chuck posted his last grade and officially began his summer, we headed to the land with a riding mower: the yard maintenance was long overdue.

We had a tiny window before rain moved in, and it was just enough time to get the main parts of the yard under control. Once the sun comes back out, we want to be ready to do some roofing!

Tiny Cabin Garden SpotTiny Cabin Land Cleared May 2016

The riding mower worked its magic, but it couldn’t handle the Bradford pear stumps along the driveway. We alternated weed-eating and hacking with a handheld weed cutter. Our arm muscles ached back into the memory of last summer’s clearing.

driveway-before

Uncleared Driveway, May 2015

Though the cabin is just a frame–and a tiny one at that–I look back at where we were last year and remember how far we’ve come. Our first attempt at driving onto the land ended with us stuck in the mud and a good bit of our budget spent on gravel. Because the truck was unable to spread the gravel evenly, we spread most of it ourselves before the mayor showed up with a backhoe. I never mentioned it, but that day I tore my right quad. It felt like it had been ripped from my kneecap. It took over ten weeks for it to heal, but heal it did.

5-19-15 Car in the mud

May 2015

At this time last year, we cleared land deeper in the woods only to later find it had become a flooded mosquito sanctuary. By the end of June, we finally settled on the spot where the cabin is now, but soaring temperatures in July and August (among other things) kept us away.

Now the summer is just beginning, and though it’s supposed to hit 90 tomorrow, it shouldn’t stay hot long. There’s more rain sprinkled in the forecast, but soon we should have enough days to finally get the cabin “in the dry.”

 

Tiny Cabin Update

A lot of people have reached out and asked, “How’s the cabin going?” so it’s definitely time for an update. The short version: the rafters and cabin are still where we left them, kissed by alternating rain and shine.

The next step: roofing. As much as I’m ready for the cabin to be “in the dry,” especially with all the rain we’ve had this year, I’m not looking forward to roofing.

For starters, there is a chance, based on the way the rafters are sitting in the hangers, that the OSB boards won’t line up perfectly at the top. We certainly don’t want our cabin to leak! In the words of a friend, we’re going to have to go forward before we know whether or not we’ll need to go backward.

We rushed with the rafters because we knew six days of storms were coming. Now, in order to take our time, we may need to wait until the semester is over in five weeks. We’ll lose many gorgeous 70-degree days, but right now we don’t have as much time or energy as we feel we need to keep moving forward.

April is perhaps too soon for a 2016 retrospective, but a year’s worth of ups and downs have squeezed themselves into three months. An immediate family member was diagnosed with cancer, we’ve lost a friend and two relatives, and we’re facing a challenging situation with a family member who is struggling with mental illness.

Yet 2016 has been surprisingly bright and beautiful as well–a trip to Washington state for a conference and to visit friends, a yoga retreat with Kevin Gardiner, an exhilarating Springsteen concert, and wonderful moments with loved ones.

The journey to building our own cabin began nearly a year ago, and we are more resolved to finish it than ever. We’ve learned about construction, patience, and as The Boss would put it, “the ties that bind.”

 

Tiny Cabin: Fire and Rain

One week we’re burning the brush pile in 39-degree air; the next, we’re sweeping water from the cabin floor in a humid 75 degrees.

Completing the rafters last Saturday was a high point in our cabin building. My brother-in-law came to help, and by afternoon all 18 rafters were up. The day could not have been more beautiful, even if the sun left its mark on our bodies.

We knew that six straight days of rain were ahead, so we covered the cabin with a tarp and put some plastic sheeting over the floor. The rain began Tuesday night, and when we went Wednesday afternoon, the land surrounding the cabin was a lake.

The water went past our ankles and soaked Chuck’s pants to the knee. Luckily, I had my rain boots on, though I discovered the left one has a hole.

In spite of our bungee cords, the tarp had blown off one side and rain was pouring in. There were already several inches of water on the floor. Using a long pipe as an extension, we were able to move the tarp over the rafter peak and re-secure it. We splashed back to the car knowing that five more days of rain lay ahead.

There was a possibility that the water would keep rising until it engulfed the cabin floor. In that case, we decided we would haul in more dirt and rebuild. Though we would like a cabin built on land, we also considered that we might have to build on a trailer bed. We decided that at some point we would have to cut our losses and run—how many thousands of dollars and hundreds of hours are we willing to spend on a thorny Bradford pear plantation?

Thankfully, the waters receded and we didn’t have to act out any of our worst-case scenario plans–at least not yet. More rain is forecast for tonight, and we will have to see how well the floor dries out this week.

 

Tiny Cabin: Building the Bathroom Walls

I surprised myself by nailing together the bathroom walls in less than thirty minutes. However, we immediately realized that the 8′ studs were so tall that our loft would be cramped. (Though we are following a set of plans, we have made modifications, which indirectly affect other things…)

Bathroom wall

The walls came apart quickly. Chuck trimmed them down once we had settled on the best height. I put them back together, undaunted–time was on our side. Or maybe the act of banging nails was so deeply satisfying that I didn’t care.

In fact, later, as Chuck went to buy the 2′ x 6′ boards for the loft, I nailed down an additional sub-floor. The OSB we originally used had too much give, so we decided to add a layer.

We raised the bathroom walls and connected them with a small metal plate. One of the bathroom walls will brace the 2′ x 6′ loft boards in the middle. No bigger than the loft is, the boards (which will be nailed into the studs of the front and back of the cabin) would have held us without the additional support. Still, it certainly can’t hurt, and we like the aesthetics of it.

Bathroom wall upBoth bathroom walls up

Building the bathroom frame has inspired us to do more research into how we will get water to the bathroom. We have vague ideas of how to catch, filter, and heat it, but soon we will need to fine-tune our logistical plan. Luckily for us, so many others have solved these problems and generously shared their experiences. We know that it isn’t a question of if, but how.

A <2 minute video on off-grid plumbing

An article on tiny-cabin plumbing

Rain was in the forecast, so we spent nearly an hour getting the tarp over the walls. With tired arm muscles, such a task is all the more challenging.

Tarp covering the tiny cabin

Tiny Cabin: Four Walls!

Chuck and I knew that putting up the walls on the tiny cabin was (ideally) a three-person job, but until minutes before heading to the land, we thought we would be alone in our pursuit. In fact, we were debating if we should even try–it was all four walls or nothing. We didn’t want a repeat of the front wall falling over in a wind gust.

As it turned out, my father-in-law beat us to the cabin site!

The walls have been finished since December, but good weather plus time off work have not been synced. We finally had our chance: last Saturday was a nearly 70 degree day. What’s more, this week is Chuck’s spring break, so we knew we would have time (and, luckily, good weather) to continue working on the cabin after the walls were up.

I have to say–my father-in-law really knows what he’s doing. Not that we don’t have some idea, but we occasionally we hit a snag that causes us to question ourselves, which takes up time.

In a matter of hours, all four walls were up, complete with California corners and additional supports. We still have some windows to finish framing, but time, for a change, is on our side. We left when the sun began to slant below the horizon, tired yet triumphant.

 

A Few of My Favorite Things…for the Tiny Cabin

I’m the kid that collected scores of stuffed animals and named each one. I had a rock collection, a stamp collection, and to this day I have my threadbare Blanky. I still regret my decision in 3rd grade to sell my Care Bear collection in a garage sale. As I grew up, I continued to surround myself with things that were special to me, whether a postcard, a painting, or a pressed flower.

My astrological sign is Cancer—the crab with pinchers. I like my shell and, by extension, my home—it’s a reflection of who I am and the things I value. I need that space to be a place of rejuvenation or else the pinchers come out.

My senior year of high school, our house caught on fire. I didn’t lose my possessions, but the experience made me ask what was really important. Had we lost everything, what would I have wanted to save? Aside from the obvious answer, my family, there weren’t very many things that made that list—a Swedish plate my grandmother gave me for a watercolor palette, my grandma’s handwritten book of poems, my mother’s quilt.

I’ve spent a lot of energy over the years sifting through my possessions and paring them down. It’s hard to choose what isn’t making the cut; it’s much easier to decide what is.

In a tiny cabin, there will only be room for the essentials and a few of my favorite things. Here’s what is on that list:

My grandmother’s oil painting on barn wood of two bluebirds.

Oil Painting of Bluebirds - Jackie Guerin

A wooden cup from my dad.

Wooden Cup with Colored Pencils

The antique jewelry box from my mother.

Antique Jewelry Box

My grandma’s glass blown “Bluebird of Happiness” by Arkansas artist Leo Ward.

Bluebird of Happiness - Leo Ward

Against these things, the rest fades quietly in the background.

Front Wall Down

While the front wall held up in spite of storms and six inches of rain at the end of November, this time we weren’t quite so lucky. We had hoped to have the side walls framed out and the walls up by December, but the work was going slowly. I often wished I had paid more attention in high school geometry, though thankfully I hadn’t forgotten everything. I think it’s all still in my brain somewhere, beneath fifteen years of other information.

Chuck, meanwhile, figured out how to use the saw to cut boards at a 45 degree angle. But in spite of our successes, the measurements were off for our side walls. We noticed this when the studs were slanting toward each other at the top. We then realized that the base was 2″ wider than the top (116″ vs. 114″), which meant that the boards for the roof pitch were too short. We used the mallet to try to beat one of the side walls into shape, only to have the wall fall apart.

In these situations, it’s better to start over anyway. We figured out where we had gone wrong, and now we just needed to know how much longer the top boards should be. We needed Pythagoras.

Luckily, the sands of time had left the Pythagorean Theorem unburied in my mind: a^2 + b^2 = c^2 .\,  Since we had the distance for “c” (our hypotenuse) and knew that “a” and “b” had to be equal, we were able to calculate the length needed rather than “guesstimating.” 116″ x 116″ (“c” squared) = 13,456 divided by 2 = 6,728, the square root of which is 82″. For some reason, we came up with 82.5″ that day, and it worked.

The walls are nearly finished. We still have to frame out a couple of windows, but then we will be ready to raise the walls. As a precaution now that winter has begun here in Arkansas, we left the front wall down and stacked the other walls on top of it. To ensure that rain would not fill the ruts between studs, we placed OSB board on top and then the tarp.

What we need next are several nice days during which we can finish framing the windows, raise the walls, and start nailing the rafters up to support the walls. Chuck’s Spring Break is seven weeks away, but there’s no guarantee that the first week of March will be lovely, or even remotely conducive to working outdoors. Last year we had a late snow that week.

Until then, we can cut grooves in the rafters, continue planning, and rest up for our next chance!

Side Walls

We were lucky this week to have two beautiful work days. The side walls are partially framed after a good bit of figuring, deductive reasoning, and internet research. I learned what a 12/12 pitch is/looks like as well as how to cut boards at a 45 degree angle. However, I am still not bold enough to do my own cutting. Aside from being slightly terrified (remembering Frost’s poem “Out, Out”), I’m left-handed. The saw is clearly designed for the other 70% of the world.

I do, however, nail. It’s a great stress-reliever, and the metal hammer makes a lovely sound on 3” nails, like a coin hitting water in a fountain. And the pitch changes the further the nail goes in.

But in spite of my love of nailing (or perhaps because of it), I managed to pull a muscle in my armpit. It has spent the past few days randomly cramping and releasing, reminding me that not all things are “mind over matter.”

We had hoped to have all four walls up, but we ran out of 2” x 4” x 12’ boards, which was just as well since we also ran out of steam. We did, however, get the gravel pile moved to what will eventually be the back porch area (courtesy of two helpful teenagers) as well as finished weed-eating a patch of grass invading the neighbor’s yard.

Highlights included thousands of blackbirds flying overhead, finding a rain puddle that might one day make a nice koi pond, and hours of breathing fresh, clean air.

Monday kicks off three days of rain, after which holiday celebrations will fill our days. We’re hoping for rest, too, and dream of a tinier home.